Well, not really Day 4, but actually Night 4! I met Adam and Lee at the house. Adam trimmed some tree branches over the garage that were close to the power drop. Then we made a trip to Home Depot to buy some pressure treated 2x4's and plywood to build the channel above the new breaker box. When everything was completed, Adam climbed up on the roof, disconnected the old service, and attempted to swing the drop to the new service pole. Unfortunately, the drop was not long enough so I have to call Progress Energy to have the drop replaced.